Included in a 5.3km section of high-speed railway infrastructure. Viaduct of 1,400m that crosses the Pisuerga River at two points, by means of two successive cantilevered spans (80m span). Completed in 22 months.
Included in a 5.3km section of high-speed railway infrastructure. Viaduct of 1,400m that crosses the Pisuerga River at two points, by means of two successive cantilevered spans (80m span). Completed in 22 months.