PROJECTS > CONSTRUCTION
BUILDING
Experience with more than 4.5 MM of m² executed of all types of buildings.
![](https://www.grupopuentes.com/wp-content/uploads/2021/02/Centro-Sanitario-A-Estrada-1920x1646.jpg)
A Estrada Health Center
Best in Class Award granted by the BIC. 4,000 m² health center, 2020.
![](https://www.grupopuentes.com/wp-content/uploads/2021/02/web_muxikebarri.jpg)
Muxikebarri Performing Arts Center and Music School
Finalist for the 2020 Architizer Prize in the category “Best Cultural Center / Theater”. Constructed area of 14,400 m² and 5,735 m² of parking space.
![](https://www.grupopuentes.com/wp-content/uploads/2021/02/web_walvis-bay-Namibia-1920x1280.jpg)
Walvis Bay Industrial Estate, Namibia
Construction and complete urbanization of a 10-hectare industrial estate (5,300m² warehouses). Execution period: 30 months.
![](https://www.grupopuentes.com/wp-content/uploads/2021/02/Escuela-Urduliz1.jpg)
Urduliz Nursery School
First Prize Thermochip Project Contest 2010 and Selected for the COAVN awards in 2013. School with 2,400 m² built and an innovative reinforced concrete cantilevered roof. The duration of the works was 12 months.
![](https://www.grupopuentes.com/wp-content/uploads/2021/02/scq_oficinas-1920x1080.jpg)
Costa Vella business complex
Construction of a 7,300 m² business complex in 18 months.
![](https://www.grupopuentes.com/wp-content/uploads/2021/02/web_congresos-vigo.jpg)
Vigo Congress Palace
23,000 m² cultural complex with auditorium, hotel, offices, shopping area and parking lot. Executed in 18 months.
![](https://www.grupopuentes.com/wp-content/uploads/2021/02/web_universidad-angola-1920x1080.jpg)
Professional training center in Luanda
7.7-hectare urbanized complex. Execution period 24 months.
![](https://www.grupopuentes.com/wp-content/uploads/2021/02/web_estacion-recoletos-1920x1280.jpg)
Recoletos Station
Railway infrastructure rehabilitation and adaptation project. Execution period: 19 months.
![](https://www.grupopuentes.com/wp-content/uploads/2021/02/web_viviendas-car.jpg)
Private housing
699,879 m² built of housing with garages for private developers.
![](https://www.grupopuentes.com/wp-content/uploads/2021/02/web_parking-vitoria-1920x1029.jpg)
Underground parking lots
105,600 m² of underground parking space built in cities.
![](https://www.grupopuentes.com/wp-content/uploads/2021/02/web_viviendas.jpg)
Public housing
468,525 m² of housing with garages for public administrations.
![](https://www.grupopuentes.com/wp-content/uploads/2021/02/Contraloria1.jpg)
General Comptroller of Ecuador
Comprehensive rehabilitation of 12,810m² of the CGE building.
![](https://www.grupopuentes.com/wp-content/uploads/2021/02/rehabi.jpg)
Restoration and rehabilitation
584,502 m² in restoration and rehabilitation of cultural heritage.
![](https://www.grupopuentes.com/wp-content/uploads/2021/02/web_centro-de-arte-y-tecnologia1.jpg)
CAyT Art and Technology Center
First Prize 2006 of the SZAV. Constructed area 43,600 m². Execution period 24 months.
![](https://www.grupopuentes.com/wp-content/uploads/2021/02/web_parking-nigran.jpg)
Parking lots
213,500 m² of public and private covered parking lots.
![](https://www.grupopuentes.com/wp-content/uploads/2021/02/web_portomolle.jpg)
Industrial estates
308 hectares of industrial and business estates.
![](https://www.grupopuentes.com/wp-content/uploads/2021/02/web_centro-empresarial-el-fresno.jpg)
El Fresno Business Center
Logistics center with an area of 20,000 m². The works were carried out in 18 months.
![](https://www.grupopuentes.com/wp-content/uploads/2021/02/web_Centro-Hospitalario-Estetico-PJ-1920x1280.jpg)
Private health center
Constructed area of 9,808 m² with the most advanced medical facilities in Europe.
![](https://www.grupopuentes.com/wp-content/uploads/2021/02/web_01-ciudadjusticia01-min-1.jpg)
Malaga Justice Building
Administrative and judicial complex of 70,000m². Execution of facade that is made up of precast pieces of white GRC architectural concrete. Execution period for the building 48 months.
![](https://www.grupopuentes.com/wp-content/uploads/2021/02/web_centro-tecnologico.jpg)
Aimen Technology Center
11,100 m² of scientific-technological infrastructure with 4,000 m² of the latest generation equipment.
![](https://www.grupopuentes.com/wp-content/uploads/2021/02/web_Centro-Geriatrico.jpg)
Residential complex in Palma de Mallorca
7,606 m². Executed in 18 months.
![](https://www.grupopuentes.com/wp-content/uploads/2021/02/web_colegio-gandasegui.jpg)
Gandasegi School
Awarded with the First Ex-Aequo Award of COAVN 2010. 3,700m². The duration of the works was 10 months.