Brigdes 10.1 and 8.2 of Las Pedrizas

Infrastructure for a double-deck dual carriageway of an average length of 735m, with 115 span pointed arches executed according to two methods: on the 8.2, using climbing formwork and folding; on the 10.1, using horizontal formwork and subsequent lifting. Each bridge was executed in 11 months.