Santiago de Veraguas, Panama

Design and construction of the rehabilitation of 98.2km of roads of variable section between 4 and 7m with asphalt pavement. Includes the execution of 21 storm drainage boxes and 12 vehicular bridges of 9.30m section width including pedestrian sidewalks, 76.125m of paved gutters, 6.525m2 of sidewalks, containment systems, horizontal and vertical signage. Includes maintenance of the work for a period of 24 months.