Guadalupe Interchange, Costa Rica

Project for the execution of a 794 m section of road that includes a pedestrian bridge, the channeling of the Torres River, and the Guadalupe interchange, with an underpass of 85 m in length, with a maximum span of 23.3 m in width . It was executed in 14 months.