New Levante speed railway
Section: Minglanilla - Embalse de Contreras
Adif (Spanish Administrator of Railway Infrastructures)
FEATURES
Total length: 7.0 km.
This section has three viaducts and two tunnels:
- Viaducts: Rodenillo Viaduct (657 m), Arroyo de las Huertas de Mateo Viaduct (995 metros) and Peinera Viaduct (520 m).
- Tunnels: Minglanilla Tunnel (520 m) and Levante A-3 Motorway Tunnel (746 m).
OBSERVATIONS
Lead time: 26 months.