New Levante speed railway
Section: Ontígola - Ocaña
Adif (Spanish Administrator of Railway Infrastructures)
FEATURES
Total length: 7.4 km.
Section main estructures:
- Cuesta Perdida Viaduct (110 m)
- Los Rincones Tunnel (372.8 m)
OBSERVATIONS
Lead time: 24 months.