Modernisation of the irrigation in the irrigable zone dependent on the Páramo Bajo Canal (León). Itacyl and Regional Government of Castilla y León.

OPM
Modernisation of the irrigation in the irrigable zone dependent on the Páramo Bajo Canal (León)
Itacyl and Regional Government of Castilla y León

FEATURES

Sector I: Provision of water for irrigation by means of conduits made of fibreglass-reinforced plastic, with a diameter of 2,000 mm, supplied from the pool 1 of Páramo Bajo Canal.

Sector V: Provision of water directly from Páramo Bajo Canal.

The pumping stations are equipped with an automated control system, which runs the start-ups and shutdowns of the pumps according to the demands of the network, based on the information received from the intake water points of and other strategic points.

OBSERVATIONS

Pumps:
- Sector I: 12 with total power of 4,410 kW
- Sector V: 11 with total power of 3,820 kW

Irrigated area (ha):
- Sector I: 3,990 ha
- Sector V: 3,837 ha

Execution period: 14 months